Skip to content
Concrete driveways, patios and slabs across Palm Beach County 561-782-0848Request an Estimate
long concrete driveway curving through a shaded lawn to a home in West Palm Beach

Driveways · Royal Palm Beach

Concrete Driveways in West Palm Beach, FL

City zoning, curb cuts, planting minimums and historic blocks, with the square-foot math for a pour on a city lot.

  • Free written estimates
  • Satisfaction Guaranteed
  • Fully Insured
  • Locally Owned & Operated

Request a Free Estimate

Tell us what you're building. We'll call to set up a site visit.

Loading the free quote form.

Prefer to talk? Call 561-782-0848.

The short answer

A concrete driveway in West Palm Beach is approved by city zoning, not by the building code, and city code requires a permit to build the apron across city property. Royal Palm Beach Concrete Co measures your lot, writes the width, setbacks and planting share into one quote, and prices it by the square foot. Free written estimate.

From the Research Tool to Civic Access: Filing the Driveway Application

The first step in this city is a web tool. The Building Division's Planning & Permitting Research Tool checks a project against zoning, lists the permits it needs and gives a rough estimate of the fees. It isn't an application, but it settles what the file must contain before anyone draws a line. Applications themselves go through the Civic Access portal, the customer side of the city's all-digital permitting system, and City Hall on Clematis Street houses Development Services.

For a concrete driveway in West Palm Beach, add three items to the file. If the work sits in a utility easement, the city's Easement Consent Form goes to Public Utilities with a copy of the survey. A Notice of Commencement is recorded with the Palm Beach County Recording Department first, and the recorded copy then goes to the city. A change of contractor carries a separate $100 fee and needs a newly recorded notice. The wider permit picture is in our county concrete permit guide.

straight concrete driveway with control joints leading to a white garage in West Palm Beach

Curb Cuts, Sidewalk Crossings and the Rules for the City's Strip

City code Chapter 78 governs the part of the driveway that crosses city property. It says no one may lower a curb, change a sidewalk grade for a driveway or build across city property without a permit. The abutting owner applies in writing and gives the points where it begins and ends, measured from the nearest intersecting street. The city may require a deposit equal to the city engineer's estimate for the curb, gutter and sidewalk being altered, and returns it on approval. No permit is granted for an entrance inside the radius of a sidewalk intersection.

Where Engineering issues a right-of-way permit for the work, its minimum conditions add a schedule. Engineering must be notified at least two business days before work starts, with 24 hours' notice for inspections, and a permit lapses if work does not begin within 30 calendar days of issue. Starting before the permit costs double the fee under Sec. 78-92. The swale rules follow the same logic: the code bars fill or top dressing that impedes a swale's drainage, and the adjacent owner sods or seeds the parkway strip. Parking on city sidewalks isn't allowed, so plan the pour and the cure around where the household cars will sit.

wide new concrete driveway at a two story home with a wood privacy fence in West Palm Beach

What It Costs

Our typical range for a pour on a city lot, before city fees.

JobPer sq ftTypical projectWhat moves the price
Concrete driveways$7 to $13$3,500 to $9,1004 to 5 in. broom finish, typical 2-car, about 500 to 700 sq ft; tear-out adds $2 to $4 per sq ft; ribbons trade concrete for form work
City permit and right-of-way charges are separate. Free written estimate after we see the site.

Setbacks, Circular Drives and Replacing a Driveway Where It Stands

The zoning code allows a single entrance no wider than 20 ft at the property line on a house with fewer than three units. A circular layout may have two openings of 10 ft each. Corner, double-frontage and alley lots may instead have two entrances of up to 10 ft each on different frontages. The Engineering Services Director may approve an alternate design where natural features make these rules unworkable.

Behind the line, a new or expanded pad in a front or corner side yard sits at least 5 ft from the front or corner side property line and 3 ft from a side or rear line, except for the portion adjoining the apron. The interior arc of a circular layout needs a radius of at least 5 ft and must be planted with living plants. The rule that matters most to a replacement is the one for existing nonconforming driveways: they may be repaired or replaced in the exact location, or with a greater setback. So a slab that already crowds the side line can be rebuilt where it is, and one that is moved has to meet today's numbers.

fresh broom finish concrete driveway leading to a stucco home garage in West Palm Beach

Front-Yard Planting Minimum and What It Leaves for the Pour

Front-yard parking has to sit on a non-dusting surface, and a poured slab qualifies. The limit that shapes the size of the pour is the planting minimum: the lesser of 1,000 sq ft or 75 percent of the front yard must be planted with living plant material. If front-yard driveways, patios and walkways are exclusively permeable pavers, that share falls to 60 percent. We pour solid slabs, so 75 percent or 1,000 sq ft is the number to plan around.

Here is how it works on a lot. A 2,000 sq ft front yard needs the lesser of 1,000 sq ft or 1,500 sq ft planted, so 1,000 sq ft, which leaves up to 1,000 sq ft for the pad, walk and steps. A 1,000 sq ft pour is $7,000 to $13,000 at $7 to $13 per sq ft, with a free written estimate after we see the site. A smaller 1,200 sq ft front yard needs 75 percent planted, 900 sq ft, and leaves 300 sq ft of hardscape, which a 20 ft wide pad only 15 ft deep would already fill. We run this arithmetic against your survey before the quote goes out.

long new concrete driveway curing beside a white rail fence in West Palm Beach

Ribbon or Slab: Choosing the Shape on a Historic Block

The city counts more than a dozen local historic districts, among them Flamingo Park, El Cid, Grandview Heights, Old Northwood and Vedado-Hillcrest. For those blocks the city's own guidance calls brick pavers, concrete driveway ribbons and poured slabs traditional, and says loose gravel or crushed shell is allowed only in side yards beyond the front 25 ft. The approval matrix rates both as staff-level review for both contributing and non-contributing properties, and staff may review the request alongside the building permit.

The choice between ribbons and a full slab changes the job. Ribbons use less material but more forming for the same length, so we price them by the square foot and discuss the form work. A 6 ft total ribbon width over 40 ft is 240 sq ft, so $1,680 to $3,120 at $7 to $13 per sq ft, while a 20 by 25 slab is 500 sq ft, so $3,500 to $6,500, each with a free written estimate after we see the site. Ask the city's planner on call which shape your block's guidelines favor before you choose.

large finished concrete slab foundation with formed edges in West Palm Beach

Older Lots, Wet Sand and What Sits Under the Forms

The housing stock here is older than in the western suburbs. The median home was built in 1988, and 5,428 of the city's 62,464 housing units date to 1939 or earlier. Single-family districts SF3, SF5 and SF7 set a 6,000 sq ft minimum lot, 60 ft minimum width and a 5 ft minimum side setback, so the 20 ft cap is roughly a third of a minimum-width lot frontage.

NRCS soil maps at 30 points inside the city boundary show Riviera fine sand and its depressional phase at nearly a third of points, with Winder fine sand next, and about 70 percent of points on units NRCS calls poorly or very poorly drained. A few points sat on filled urban land or on excessively drained coastal-ridge sands, so the ground under one part of the city can differ from the next. Flood zones at the same points were X at 50 percent and A at 40 percent. We check the parcel's zone before we price base and fill.

Pour Day on a Narrow City Lot

A narrow city lot can leave little room for a ready-mix truck, a pump line and a crew, so we settle the plan before the date is set. Sunshine 811 has to be notified at least two full business days before any digging. The forms go in after the demolition and the compacted base, and any inspection the permit calls for comes before the truck. On the day, we place and finish in the cooler part of the morning when we can, because hot sun and wind pull moisture out of fresh slabs, and we don't sprinkle water on the surface to ease finishing. Curing starts as soon as finishing ends and runs at least three days, up to seven.

Afterward, the household stays off the slab and the apron. Cars wait on the street or a neighbor's space, never on the city sidewalk, until we say the pour can carry weight.

Getting a Written Quote for a Concrete Driveway in West Palm Beach

For a concrete driveway in West Palm Beach, send the street, the lot width, a photo of what's there now and the survey if you have it through our free estimate page. We take the permit questions above, add the square footage and a tear-out line if an old slab must come out at $2 to $4 per sq ft, and write one detailed quote before any work begins. For the neighborhood-level picture, see concrete contractors in West Palm Beach, and for the general job the driveway service page. The cost guide compares other towns.

Questions We Get

Does the HB 803 exemption remove the permit for a concrete driveway in West Palm Beach?
No. The city's Permits FAQ says fence and driveway permits are still required because they come from the zoning code, which regulates location, material and square footage, and not from the building code. The exemption also excludes any work on a property in a flood hazard area.
Can I rebuild my old driveway where it is, even if it sits close to the line?
Existing nonconforming slabs may be replaced in the exact location, or with a greater setback. One that moves has to meet the current 3 ft side and 5 ft front setbacks. Bring your survey so we can show which case you are in before you decide.
Do I have to plant the front yard if I widen the approach?
Yes. The lesser of 1,000 sq ft or 75 percent of the front yard must be planted with living plants, so a wider approach can run into that limit. A poured slab doesn't earn the lower 60 percent share, which is reserved for exclusively permeable paver systems.
Can I park on the sidewalk while the new apron cures?
No. The city's right-of-way conditions state that parking on city sidewalks is not allowed. Plan a place for the cars before the demolition day, and count on several days of cure before the apron takes weight.
Will a circular driveway fit on a standard 60 ft lot?
The code allows a circular layout with two openings no wider than 10 ft each, and the interior arc needs a radius of at least 5 ft, planted with living plants. On a minimum-width 60 ft lot, the front-yard planting minimum can decide whether the geometry fits.
Who is the apron permit from if I live on Congress Avenue?
The city's roadway list shows Congress Avenue as a county road, while Okeechobee Boulevard and Military Trail are state roads. On a county road, ask the County's Engineering Land Development Division about a connection permit, and on a state road ask FDOT. Confirm with the road owner by name before you plan the apron.

Sources we used

Find Us on the Map

Open the map for directions, hours and our Google reviews.

561-782-0848

Mon to Sun, 8am to 8pm

Open us on Google Maps

Page updated

Free written estimate for your West Palm Beach driveway

Call 561-782-0848 or use the quote form. We measure the lot and send a detailed written quote before any work begins.

Request an Estimate
CallFree Estimate