Skip to content
Concrete driveways, patios and slabs across Palm Beach County 561-782-0848Request an Estimate
long new concrete driveway curing beside a white rail fence in Wellington

Driveways · Royal Palm Beach

Concrete Driveways in Wellington, FL

Replacements, third-car extensions and long horse-lot approaches, built to the Village packet and priced by the square foot.

  • Free written estimates
  • Satisfaction Guaranteed
  • Fully Insured
  • Locally Owned & Operated

Request a Free Estimate

Tell us what you're building. We'll call to set up a site visit.

Loading the free quote form.

Prefer to talk? Call 561-782-0848.

The short answer

A concrete driveway in Wellington has to match the old one in material and color when you extend it, stay 2 feet off the side line and clear a formboard inspection before the truck rolls. Royal Palm Beach Concrete Co measures from your survey and quotes the pour in square feet. Free written estimate after we see the site.

Extending or Replacing: What the Village Reads in a Wellington Driveway

About four in five Wellington homes were built between 1980 and 2009, and the Census puts the median year at 1995. If your driveway is as old as the house, we check it at the visit and price any tear-out or widening as its own line. Wellington's driveway rules lean toward continuity. An expansion has to match the existing driveway in material and color, a side interior setback of 2 ft applies on single-family lots, and a lot on a local road gets no more than two driveways. The Building Division on Forest Hill Boulevard reviews all of it through the Driveway Packet that our driveway permit guide walks through.

This page stays on the pour itself. If you want the town-wide picture of permits, equestrian subareas and patios, read our page on concrete contractors in Wellington. If you want the general job, the concrete driveway service page explains thickness, joints and cure. Here we cover what changes for a concrete driveway in Wellington: the survey, the pitch, the removal, the long lots and the finish.

smooth concrete driveway in front of a two car garage home in Wellington

Measure From the Survey, Then Price the Square Feet

The packet wants a survey no older than two years, marked up to show every square foot of driveway and walkway work, and it says the proposed work must exactly match the final field conditions. That makes the survey the blueprint for any concrete driveway in Wellington. We lay a tape against it at the free estimate, note the swale, any easement and the apron, and write the square footage into the written quote so the number you pay and the number the Village reads are the same.

Here is the math at our typical range of $7 to $13 per sq ft for a broom finish. A 24 by 24 two-car pad is 576 sq ft, so $4,032 to $7,488. A 30 by 30 pour with a third bay is 900 sq ft, so $6,300 to $11,700. Our typical project runs $3,500 to $9,100 for 500 to 700 sq ft. A tear-out adds $2 to $4 per sq ft, and the Village's permit fee is separate. Every number is confirmed in a free written estimate after we see the site.

broad concrete driveway serving a three car garage house in Wellington

What It Costs

Our typical range for a driveway pour in Wellington, before Village fees.

JobPer sq ftTypical projectWhat moves the price
Concrete driveways$7 to $13$3,500 to $9,1004 to 5 in. broom finish, typical 2-car, about 500 to 700 sq ft; tear-out adds $2 to $4 per sq ft; muck or a long approach raises base and joint work
Village permit fees are separate. Free written estimate after we see the site.

A Third Bay Without a Seam: Matching the Old Slab

A third car space is one reason to extend a concrete driveway in Wellington. A 12 by 24 strip is 288 sq ft, so $2,016 to $3,744 at $7 to $13. Cost isn't the hard part. The Village's matching rule means the strip must share material and color with the existing driveway, and a decorative border or pattern is allowed only if all sections carry one continuous pattern and none divides one part from another. A broom-finish strip beside a stamped slab fails that test on its face.

Concrete color also ages, so a new strip poured beside a 25-year-old gray slab can read lighter for a while. We talk through that at the visit and, where the match matters to you or your homeowners association, we suggest replacing the whole surface instead of patching beside it. Keep the 2 ft side setback in mind when you plan the width, because it limits how far toward the property line the strip can go. A new patio next door counts toward the front-yard cap if it sits in front.

concrete driveway and poured concrete steps up a sloped front yard in Wellington

Pitch, Swale and the Water That Leaves the Slab

Federal NRCS soil maps at 30 points inside the village show Riviera fine sand at a third of points and Holopaw fine sand at a fifth, with muck units making up another fifth, and the survey rates every unit poorly or very poorly drained. About 40 percent of those map points were in FEMA Zone AE. Poorly drained ground gives water few places to go, so a concrete driveway in Wellington has to shed it. The packet says improvements cannot impede existing drainage and that the formboard inspection confirms the pitch is enough for stormwater. A certification of driveway and swale grading is also required at final inspection.

The swale in front of your house belongs to the drainage system. The Village says not to pave it, not to enlarge a driveway culvert and not to lower one. Wellington's own code notes that its drainage goes into the C-51 canal, then through a South Florida Water Management District treatment area on its way to the Loxahatchee refuge. When an area of muck turns up under the forms, we stop and price a deeper base before we pour, not after.

finisher pulling a bull float across a fresh concrete driveway pour in Wellington

Taking Out the Old Slab Before the New One Goes In

Replacing a concrete driveway in Wellington starts with demolition. The saw cuts, the old slab is broken and hauled away, and the base is graded and compacted before any form is set. In a swale-lined neighborhood we mark the culvert and the apron edge first, and Sunshine 811 is called before digging. Removal adds $2 to $4 per sq ft to the pour, which is why a quote should show demolition as its own line and not hide it in one number.

The apron deserves attention. The right-of-way portion is a 6 in. pour at a minimum of 3000 PSI with no steel or wire mesh in new drivable area, flared out with a 2 ft setback from the property line. We keep that part separate in the quote from the part inside your lot, where the thickness and reinforcement are ours to propose, at 4 to 5 in. with a joint at the seam.

formed concrete slab foundation with stepped edges on bare soil in Wellington

Acre Lots, Barn Approaches and Horse Properties

A concrete driveway in Wellington on a lot of one acre or more pulls an engineering permit instead of a building permit. If your lot is in Grand Prix Village, Palm Beach Point, Rustic Ranches or Wellington CountryPlace, check the acreage on your survey first, because it decides the track. A third driveway can be approved on lots of 1.75 acres or more, on Aero Club corner lots, or on lots over an acre that serve a detached garage or hangar. These properties also have the longest approaches. A 16 by 150 approach is 2,400 sq ft, so $16,800 to $31,200 at $7 to $13 per sq ft, again before permit fees and a free written estimate after we see the site.

Distance is a layout problem, not just a price, whether the barn sits near Equestrian Club Drive or at the back of a Rustic Ranches lot. Long runs need joints laid out to keep panels from cracking, a plan for how trucks reach the pour, and a decision on whether the run passes a swale or a bridle path. The Village engineering forms include a bridle-trail easement and horse-wash details, so if your approach crosses either, mention it when you call.

Finish Choices That Stop at the Property Line

Broom finish is our standard. If you want color or a pattern, the line is the property edge. The Driveway Affidavit prohibits a coating such as paint or decorative texture inside the public right-of-way, and the Village code bars paint, stain or sealant on aprons. Inside the lot, a stamped surface is an approved material in the design standards, and the Architectural Review Board keeps the approved color charts. A stamped slab needs resealing every two to three years.

The ready-mix industry's guidance is to keep a new slab curing for three to seven days. The quote says when the driveway is ready for your car, so you can plan parking on the street or the lawn for that stretch.

Get a Written Number for a Concrete Driveway in Wellington

For a concrete driveway in Wellington, send the street or subdivision, the age of the house if you know it, a rough width and length, and a photo of the front of the lot through our free estimate form. We'll walk it with the survey and write the square footage, the demolition, the apron and the pour into a detailed quote before any work begins. If the work crosses into the right-of-way, the quote lists the formboard inspection as a step and shows the Village permit fee as a separate line. For general prices across the county, see the driveway cost guide.

Questions We Get

Can I add a third bay and keep the old color?
Wellington requires an expansion to match the existing driveway in material and color. Fresh concrete can read lighter than a slab that has weathered for years, so the strip can look different even when the mix is the same. Where the match matters, we suggest replacing the whole surface. We explain the options at the visit.
Do the steel rules for the apron apply to the rest of a concrete driveway in Wellington?
No. The packet's no-steel line applies to the right-of-way, apron and sidewalk in new drivable area. On your own lot we write the thickness and reinforcement in the quote. The two sections meet at a joint, so any movement between them shows up at a straight line instead of a random crack.
How do I know if my approach is long enough to need an engineering permit?
Length doesn't decide it. Lot size does: a parcel of one acre or more uses an engineering permit in place of a building permit. A long approach on a smaller lot stays on the building track. The Driveway Affidavit asks the question first, so we answer it from your survey.
Can I have a second entrance on a corner lot?
The code allows at most two driveways on a lot on a local road, and a third only in listed cases such as Aero Club corner lots or lots of 1.75 acres or more. How the second entrance sits against the corner depends on the road, so confirm it with the Building Division before drawing it.
Will the formboard inspection hold up my pour date?
It can, because concrete isn't allowed until the forms pass. The first re-inspection is $60 if the forms aren't ready, so the forms are built to the survey and the truck isn't ordered until the visit is on the calendar. Plan the pour date after you hear the inspection date, not before.
Is a stamped concrete driveway in Wellington worth the extra cost?
It can be, on the lot side of the property line. The Village design table scores a stamped driveway the same as a paver driveway for new homes, and our stamped range is $12 to $20 per sq ft, with a free written estimate after we see the site. The coating ban covers the right-of-way, so the apron stays plain.

Sources we used

Find Us on the Map

Open the map for directions, hours and our Google reviews.

561-782-0848

Mon to Sun, 8am to 8pm

Open us on Google Maps

Page updated

Free written estimate for your Wellington driveway

Call 561-782-0848 or use the quote form. We measure from your survey and send a detailed written quote before any work begins.

Request an Estimate
CallFree Estimate