Palm Beach at a glance
The Town of Palm Beach is the island municipality, with Worth Avenue, Royal Poinciana Way, Lake Trail, the Breakers and the Flagler Museum inside its limits.
About half of the town polygon is water. Land-only NRCS soil and FEMA map points show Canaveral-Urban land at 30%, excessively drained Palm Beach-Urban land at 23%, and flood zones AE at 43%, X at 40% and VE at 3%.
Permit office: Town of Palm Beach Planning, Zoning & Building · official site PZB issues the building permit and runs design review. Public Works issues the driveway permit for the right-of-way.
Design Review Comes Before the Permit: ARCOM, Landmarks and Staff-Level Hardscape
Under the town code, no permit is issued for building or landscaping plans or other development of property until the Architectural Commission, called ARCOM, approves, unless the director finds the improvements minimal in nature and not on the Manual's list. Properties that are designated landmarks or in a historic district go to the Landmarks Preservation Commission instead. The Project Designation Manual has a hardscape row covering driveways and patios in three levels: extensive alterations go to the commission, minor alterations to the commission chair, and work interior to the lot and not readily visible from the right-of-way to staff.
A staff-level application asks for an existing and proposed site plan, current color photos, the Town's planting legend sheet, an exterior materials and finishes sheet and product approvals. A condominium also needs an association approval letter. Review fees run $450 for ARCOM administrative review, $2,000 for a minor project and $3,000 for a major one, so plan the pour around the review. Our permit guide covers the countywide basics.
Before you approve a bid from concrete contractors in Palm Beach, ask which review level the plan falls in. The review fee and the wait come before the pour.

The Driveway Agreement for Anything Not Plain Concrete or Asphalt
Public Works issues a driveway permit for any alteration, addition or removal of a driveway in the town. The application wants construction detail drawings, a maintenance of traffic plan and a narrative of the work. If any portion of the driveway in the right-of-way or utility easement is not plain concrete or asphalt, the owner must sign a recorded Driveway Agreement, and decorative driveways are not permitted in the right-of-way where a sidewalk or bicycle path exists.
The recorded agreement says the work does not conform with town ordinances, commits the owner to remove it at their own expense if the town needs the space, and runs with the land. That is why we price a plain broom apron and a stamped driveway on the lot side separately. See our driveway page and stamped concrete page.

What It Costs
Design review, a short pour calendar and island logistics shape the quote. These are our typical ranges.
| Job | Per sq ft | Typical project | What moves the price |
|---|---|---|---|
| Concrete driveways | $7 to $13 | $3,500 to $9,100 | 4 to 5 in. broom finish, typical 2-car, about 500 to 700 sq ft; plain concrete is simplest in the right-of-way; tear-out adds $2 to $4 per sq ft |
| Concrete patios | $7 to $13 | $1,750 to $5,850 | Plain or broom, about 250 to 450 sq ft; stamped is priced separately; a hardscape not visible from the street is staff-level review |
| Stamped & decorative | $12 to $20 | $3,600 to $12,000 | Pattern, color and sealer, about 300 to 600 sq ft; decorative work in the right-of-way needs a recorded agreement |
| Slabs & foundations | $7 to $12 | $1,400 to $7,200 | 4 in. reinforced, shed pad to 2-car garage, about 200 to 600 sq ft; narrow weekday windows affect scheduling |
| Sidewalks & walkways | $8 to $14 | $1,200 to $4,200 | 4 in., 3 to 5 ft wide, about 150 to 300 sq ft; short runs hit a job minimum |
A Pour Calendar With No Summer Saturdays and a Winter Blackout
Section 42-199 prohibits concrete pours and sawing on Saturdays from May 1 through October 31 unless the building official waives the rule for compelling circumstances, and Saturday material deliveries are banned too unless waived. From November 1 through April 30, all construction is prohibited on Saturdays, Sundays, town holidays, the days around Thanksgiving, and December 24 through January 1. Winter weekday hours are 8 a.m. to 5 p.m. with no site noise before 9.
Summer weekday hours outside Worth Avenue run 7:30 a.m. to 5:30 p.m. In the Worth Avenue district, construction is allowed only May 1 through October 31. Work in the road right-of-way cannot begin before 9 a.m. unless the permit says so. A right-of-way request in season has to explain why it must happen then and fit a two hour window between 10 a.m. and 2 p.m. We build these limits into the schedule from the first visit.
The calendar is the hard part, so as concrete contractors in Palm Beach, we plan around it before we set a price.

How the Job Goes
Site photos and review level
We look at the street view and decide which review level the work needs.
Written quote
The quote lists permit fees, review fees and the schedule limits.
Review and permits
Design review, the building permit and the Public Works driveway permit are filed in order.
Pour on an allowed day
We schedule around summer Saturdays, winter weekends and holiday blackouts.
Final walk
We finish, cure and walk the job with you after inspection.
A Dollar per Square Foot, Plus a Public Works Approach Fee
The town's fee schedule lists a building permit for a driveway or hardscape at $1.00 per square foot of area, plus compliance fees, a 4% technology fee and surcharges. A Public Works driveway approach up to 20 lineal feet wide is $180, and wider approaches add $3.60 per lineal foot. Every right-of-way permit carries a $25 application fee, and a Driveway or Walkway agreement costs $100 to prepare or review. Working in the right-of-way before the permit issues costs 200% of the permit fee plus $150 a day. A gate on a driveway is a separate $700 item.
A 576 square foot court carries about $576 of permit fee before surcharges. We list those figures in the written estimate so they are not a surprise after the job is priced.
The Town charges by area, so ask concrete contractors in Palm Beach to total the permit and approach fees in the quote.

Landscaped Open Space in R-B: Forty-Five Percent, Forty in the Front Yard
In the R-B Low Density Residential district the minimum landscaped open space is 45 percent, half of it perimeter landscaping within ten feet of the property line unless the lot is 20,000 square feet or more. At least 40 percent of the required front yard must be landscaped open space, and lot coverage is 40 percent for one-story buildings and 30 percent for two-story buildings. Open space excludes driveways and parking areas. Larger R-B lots follow the R-A or R-AA rules, and lakefront lots of 20,000 square feet or more between Dunbar Road and Reef Road are excepted. The staff application asks for an open space diagram, and a hardscape in a setback may need a neighbor consent form. See our patio page for sizing.

An Island That Is Half Water: Canaveral Soil, AE Zones and Worth Avenue to Dunbar Road
About half of the Census polygon is water, so the land-only map points are the useful ones. Canaveral-Urban land, somewhat poorly drained with a water table that can rise to about 54 centimeters at its highest, was 30% of land points, Palm Beach-Urban land, excessively drained, was 23%, and Urban land, Cocoa-Urban land and Pomello fine sand made up most of the rest. Flood zones were AE at 43%, X at 40%, X 0.2% coastal at 13% and VE at 3%. Check your parcel on the town's FEMA map before you set a finished height for a patio or garage slab, and ask Planning, Zoning and Building how the flood zone affects the plan. Soil units on the island range from excessively drained to somewhat poorly drained, and base work is priced after we see the lot.
Streets and landmarks inside the town include Worth Avenue, Royal Poinciana Way, Whitehall Way, Lake Trail, Dunbar Road and Reef Road. Slab jobs on low ground are covered on our slab page.
Mainland Neighbors Across the Lake
The island town is separate from West Palm Beach, Riviera Beach, Lake Worth Beach and Lantana, and each of those has its own permit office. Ask which town your parcel is in before you call a contractor, because a Palm Beach mailing address does not settle it. Parcels inside the Town of Palm Beach answer to the Town for the building permit and the driveway permit, while a mainland parcel answers to its own city or to the County. Each office has its own review steps, fees and working hours, and the Saturday pour rule here is the Town's own. The service area page lists every office.
If your house is in a historic district, the plan goes to the Landmarks Commission, and as concrete contractors in Palm Beach, we say so up front.
Ask Concrete Contractors in Palm Beach About Review Before Price
Send photos from the street, a site plan if you have one, and whether the house is a landmark or in a historic district. We tell you which review level the work likely falls in and which Saturdays are off the table. Royal Palm Beach Concrete Co is Locally Owned & Operated, and the written quote comes before any work begins. Start on the contact page, and ask any concrete contractors in Palm Beach how they handle the Driveway Agreement and the Saturday rule. Also tell us if the property is a condominium, since an association approval letter is part of the staff application, whether a driveway gate is in the plan, since a gate is a separate $700 fee, and how large any motor court is, since hardscape is billed by the square foot.
Concrete Services in Palm Beach County
Concrete Driveways and Sidewalks
Driveways and Walkways in Palm Beach
On the island, Public Works Engineering issues the driveway permit and Planning, Zoning and Building issues the building permit. The master fee schedule lists a driveway approach up to 20 feet wide at $180, plus $3.60 per lineal foot for a wider one, a $25 application fee, and $1.00 per square foot for the building permit on Driveway / Hardscape. Any part of a driveway in the right-of-way that is not plain concrete or asphalt needs a recorded Driveway Agreement, and decorative driveways are not permitted there where a sidewalk or bike path exists. Design review comes first: Architectural Commission review, or Landmarks review in a historic district. Plain concrete driveways run $7 to $13 per square foot after a free written estimate. See the county permit guide.
Concrete Patios & Porches
Patios and Terraces in Palm Beach
The town's Project Designation Manual sorts hardscape into three levels. Major site changes go to Commission review, minor ones to the Commission Chair, and work interior to the lot and not readily visible from the right-of-way is approved by staff. A staff-level application includes existing and proposed site plans, color photos, and a material and finishes sheet, and a hardscape change in a setback may need a Neighbor Consent Form. Administrative review is $450. Which of the three levels applies to your lot is worth settling before anyone prices the forms. A 15 by 20 foot patio comes to 300 square feet, so $2,100 to $3,900 at $7 to $13 per square foot, with a free written estimate after the visit. See our patio page and stamped concrete.
Concrete Slabs, Foundations, & Garage Floors
Slabs and Pour Windows in Palm Beach
Island construction hours shape the schedule more than the slab does. From May 1 through October 31, Sec. 42-199 bars concrete pours and sawing on Saturdays unless the building official waives it. From November 1 through April 30 there is no construction on weekends or from December 24 through January 1, and the Worth Avenue district allows no work from November through April. About 43 percent of the 30 land points checked against FEMA maps are Zone AE, so look at the flood zone early. The slab is a 4 inch reinforced pour over compacted base. A 20 by 20 foot pad is 400 square feet, or $2,800 to $4,800 at $7 to $12 per square foot, with a free written estimate. As concrete contractors in Palm Beach, we link the slab page.
Questions We Get
Does a driveway replacement in Palm Beach need ARCOM approval?
Can I pour on a Saturday in Palm Beach?
What is a Driveway Agreement?
Can I put a stamped driveway across the sidewalk strip?
Why is there no work on Worth Avenue in winter?
How do I find concrete contractors in Palm Beach who know the review process?
Sources we used
- Construction & Landscaping Working Hours, Town of Palm Beach
- ARCOM/Landmarks Administrative Review Guide, Town of Palm Beach PZB
- Master Fee Schedule, Town of Palm Beach
- Architectural Commission, Secs. 18-166 to 18-177, Palm Beach Code (Municode)
- Project Designation Manual Matrix, Town of Palm Beach
- Right-of-Way Permit Application, Town of Palm Beach Public Works
- Sec. 42-199 Hours for construction work, Palm Beach Code (Municode)
- R-B Low Density Residential District, Palm Beach Code (Municode)