Skip to content
Concrete driveways, patios and slabs across Palm Beach County 561-782-0848Request an Estimate
curving stamped concrete walkway in a brick pattern through a yard in Haverhill

Palm Beach County · Concrete Contractors

Concrete Contractors in Haverhill, FL

Driveways, patios and slabs in a 0.61 square mile town with its own Building and Town Engineer driveway reviews.

  • Free written estimates
  • Satisfaction Guaranteed
  • Fully Insured
  • Locally Owned & Operated

Request a Free Estimate

Tell us what you're building. We'll call to set up a site visit.

Loading the free quote form.

Prefer to talk? Call 561-782-0848.

The short answer

As concrete contractors in Haverhill, we work inside a 0.61 square mile town whose driveway checklist wants a notarized application from both owner and contractor, a cross-section, and a front-yard impervious calculation that does not exceed 40 percent. Royal Palm Beach Concrete Co pours driveways, patios and slabs here with a free written estimate.

Haverhill at a glance

Haverhill is an incorporated town of about 0.61 square miles near West Palm Beach, with Town Hall on Charlotte Street and the County's Haverhill Park on Belvedere Road. The Town maintains the right-of-way strip along Haverhill Road and Belvedere Road.

NRCS soil maps at 30 points show Myakka fine sand at two of every three points, with Immokalee, Basinger, Anclote and Pompano sands making up the rest. Every mapped unit is poorly or very poorly drained. On FEMA maps, two-thirds of the points are in Zone X and one-third in Zone AE.

Permit office: Town of Haverhill Building Department · official site The Town lists fences, sheds, patios, slabs and driveways as work that needs a permit. Contractors must register with the Town first, and driveways go through a Building Code review and a Town Engineer review.

Fences, Sheds, Patios, Slabs and Driveways Are All on the Town's Permit List

The Haverhill Building Department page leaves little room for doubt. It says building permits are required for all aspects of home repair and adds that fences, sheds, patios, slabs and driveways also require permits. Painting and replacing carpet or interior tile are the examples it gives of work that does not. Permits must be obtained before work begins, and work started early is subject to penalties.

Contractors working in the Town must register with the Town before starting. The Town adds that if you hire someone else, the permit responsibility is theirs, so ask any bidder among the concrete contractors in Haverhill to show you their registration. Applications go in electronically or in person at Town Hall on Charlotte Street, with hours from 7:30 a.m. to 3:30 p.m., Monday to Friday, and inspection requests for the next day are due by 3 p.m. The forms page posts the Driveway Checklist, an Owner Builder Disclosure Statement, Notice of Commencement instructions and easement agreements.

For the rules that apply in every Palm Beach County town, see our permit guide.

concrete driveway and poured concrete steps up a sloped front yard in Haverhill

Notarized by Both Sides: The Residential Driveway Checklist

The Town's Residential Driveway Application Checklist asks for a permit application signed and notarized by both owner and contractor, the Property Appraiser detail, HOA approval if one applies, a driveway cross-section, a marked-up survey and photos, and a front-yard impervious calculation that does not exceed 40 percent. It also asks for a Notice of Commencement (NOC) on jobs valued at $5,000 or more, which matches the state point at which the building department must get a copy before the first inspection. The recording duty itself starts lower: under F.S. 713.13, an NOC must be recorded for an improvement over $2,500, and the owner signs it.

The cross-section is where a quote turns into a drawing, and as concrete contractors in Haverhill we sketch one at the estimate. It shows the compacted base, the concrete thickness and what meets the street. We write those numbers into your quote so the cross-section on the application matches the price you approved.

The checklist closes with two warnings: properties that abut a major thoroughfare may need county and state permits as well, and 811 should be called before any excavation. See our driveway page for the base and thickness choices behind that drawing.

smooth concrete driveway in front of a two car garage home in Haverhill

What It Costs

Here are our typical ranges. Haverhill's engineering reviews, notarized forms and 40 percent front-yard cap shape what a job costs.

JobPer sq ftTypical projectWhat moves the price
Concrete driveways$7 to $13$3,500 to $9,1004 to 5 in. broom finish, about 500 to 700 sq ft; 10 to 24 ft wide; tear-out adds $2 to $4 per sq ft
Concrete patios$7 to $13$1,750 to $5,850Plain or broom, about 250 to 450 sq ft; stamped priced separately; counts toward the 40% cap only in the front yard
Stamped & decorative$12 to $20$3,600 to $12,000Pattern, color and sealer, about 300 to 600 sq ft; a decorative border must be continuous
Slabs & foundations$7 to $12$1,400 to $7,2004 in. reinforced, shed pad to 2-car garage, about 200 to 600 sq ft; Town permit required for slabs
Sidewalks & walkways$8 to $14$1,200 to $4,2004 in., 3 to 5 ft wide, about 150 to 300 sq ft; front-yard walks count toward the 40% cap
A 20 by 20 foot driveway widening is 400 sq ft, so $2,800 to $5,200 at $7 to $13 per sq ft. Tear-out, the pipe under a swale crossing and two engineering inspections move the number, and as concrete contractors in Haverhill we list them separately. Expect a free written estimate after we see the site.

Two Reviews, Three Inspections, and a Base Left Open for the Engineer

Every driveway permit gets a Building Code review and a Town Engineer review. The checklist lists three inspections: Engineering In Progress at the placement of the compacted sub-surface, Engineering Final after the hard surface is installed, and a Building Final when all work is complete and the area is resodded.

The first inspection sets the schedule. The engineer comes to look at compacted base before concrete covers it, so the pour has to wait until that visit has happened. We set the base, wait for the Engineering In Progress visit and only then order the truck, because concrete placed before that visit defeats its purpose.

The last inspection is not about the concrete at all. The resodded area is part of the final, so budget for sod wherever the work disturbed the yard. Requests for next-day inspections are due by 3 p.m., so whoever holds the permit should have the final request on the calendar before the work wraps.

new concrete slab beside a house wall with jointed panels in Haverhill

How the Job Goes

  1. Survey and front-yard math

    You send the survey and photos, and we run the 40 percent figure.

  2. Site visit

    We measure the width, the swale crossing and the apron.

  3. Written quote

    Width, thickness, base, pipe and tear-out are priced line by line.

  4. Notarized application

    Owner and contractor sign; the Town runs Building and Engineering reviews.

  5. Base inspection, pour, final

    The Town Engineer sees the base, then the surface; the Building Final checks the resodded yard.

Ten to Twenty-Four Feet Wide, Two Access Points and a Five-Foot Buffer

Section 58-365 of the Town code governs residential driveways. A building permit is required for all installations, modifications and improvements to driveways and parking areas, and vehicles must park on a durable surface the Town Engineer approves, including concrete, pavers or asphalt. Each parking space is at least 8 by 20 feet.

Driveways must be at least 10 feet and no more than 24 feet wide, with an 18 foot minimum where needed for emergency access. New or expanded front-yard driveways sit 5 feet from front, corner-side, side and rear lot lines, except where the driveway meets the apron and the street. No lot may have more than two driveway access points to a street, and the connection is flared as the Town or County engineer decides.

A minimum five-foot planted buffer separates driveway or parking areas from the residential structure, except where the driveway connects to a garage or carport. Circular driveways need an interior arc with a minimum 5 foot radius, planted with living plant material.

large finished concrete slab foundation with formed edges in Haverhill

Forty Percent of the Front Yard, Counting Patios and Walkways

The impervious cap works as a budget. Section 58-365(d) says total impervious area in the front yard may not exceed 40 percent, including driveways, parking areas, walkways and patios. A front yard of 2,000 square feet, as an illustration, allows 800 square feet of hard surface in total, and a 24 foot wide driveway at 30 feet long already uses 720 of those.

That arithmetic is why a front walk and a front patio come out of the same allowance as the driveway, which, as concrete contractors in Haverhill, we total before quoting a widening. A patio in the back yard is not part of that 40 percent calculation, though it still needs its own Town permit. See our patio page for sizing back-yard slabs.

Expansions must match the existing driveway in material, and a decorative border is allowed if its pattern is continuous. Nonconforming driveways may be repaired but not enlarged. Our stamped concrete page shows the decorative finishes that could sit in a border.

broad concrete driveway serving a three car garage house in Haverhill

Flatwoods Sand: Myakka at Two of Every Three Points

NRCS soil maps at 30 points inside the town show Myakka fine sand at 66.7 percent of points, Immokalee fine sand at 13.3 percent, Basinger fine sand at 10 percent, Anclote fine sand at 6.7 percent and Pompano fine sand at 3.3 percent. Every mapped unit is poorly or very poorly drained and rated very limited for dwellings without basements.

The minimum annual water table sits about 31 centimeters down, a foot or so, for Myakka and Immokalee, and 7 to 15 centimeters for the others. Two-thirds of the same map points are in FEMA Zone X and one-third in Zone AE, so check your parcel before assuming.

For a driveway or a slab that means a compacted base that sheds water, a grade that moves runoff off the pad, and attention to the swale. The Town may require a pipe where a driveway crosses a swale or other drainage facility, and swales cannot be altered without an engineering permit. Our slab page explains how base and thickness change with wet ground.

Haverhill Road, Belvedere Road and the Strip Between Street and Sidewalk

The Town says it maintains the public right-of-way between the street and the sidewalk on Haverhill Road and Belvedere Road, along with drainage areas within the Town. For a driveway that crosses that strip, the code puts maintenance of the part inside the right-of-way on the abutting owner. Sidewalks may not be altered, painted or stained.

Haverhill was incorporated in 1950 and sits close to downtown West Palm Beach and Palm Beach International Airport. The County owns and runs Haverhill Park on Belvedere Road. Census estimates put the median home's construction year at 1984.

If your lot fronts a major road, county and state permits may apply on top of the Town's. Ask before you plan a new curb cut. On those two roads the strip is the first thing we measure.

Around Haverhill

West Palm Beach lies to the north, with Palm Springs and Greenacres a few miles south. The permit rules differ: West Palm Beach has a 20 foot limit at the property line, Palm Springs wants a notarized zoning form, and Greenacres limits a lot to one driveway. See the West Palm Beach page and the Palm Springs page if your property sits near the line. Lake Belvedere Estates just west and Westgate to the east are unincorporated and use the County instead, as the service area page shows. As concrete contractors in Haverhill who also work in those places, we check which office covers each address before we quote, and that is worth asking any bidder about.

Where to Start With Concrete Contractors in Haverhill

Send your survey, two photos of the existing driveway and the street edge, and the HOA name if you have one. We measure the front yard and work out the 40 percent allowance. Width, thickness, base and tear-out then go into a detailed written quote before any work begins. Royal Palm Beach Concrete Co is Locally Owned & Operated and fully insured. Use the contact page to ask for a free written estimate. The application needs the impervious calculation, so as concrete contractors in Haverhill we give it to you in writing. We also confirm the Town registration status at that first visit.

Concrete Services in Palm Beach County

Concrete Driveways and Sidewalks

Driveways in Haverhill

Haverhill spells out its driveway rules in Sec. 58-365. Width runs from 10 to 24 feet, no lot may have more than two openings to a street, and new or expanded front-yard driveways sit 5 feet off the front, corner-side, side and rear lines, except the part joining the apron. The checklist wants an application notarized by owner and contractor, a cross-section, a marked-up survey and photos, and an impervious calculation that does not exceed 40 percent of the front yard. Two Town Engineer inspections follow, one at the compacted base and one after the hard surface, and the Building final requires the area resodded. Expansions must match the existing material, and sidewalks may not be altered or stained. As concrete contractors in Haverhill, we price a pour at $7 to $13 per square foot after a free written estimate. The driveway cost guide compares job sizes.

Concrete Patios & Porches

Patios and Walkways in Haverhill

Patios and slabs both require a Town permit, and a front-yard patio shares the 40 percent front-yard impervious cap with the driveway and walkways, so a front sitting area eats into the same allowance. A planted buffer of 5 feet is required between driveway or parking areas and the house, except where the pavement meets a garage or carport. A rear patio is not in the front yard, and a 10 by 20 foot pad is 200 square feet, or $1,400 to $2,600 at $7 to $13 per square foot, with a free written estimate after the site visit. If a utility easement crosses the lot, the Town posts a consent form and an easement removal agreement. Walkway pricing sits on the sidewalk page, and sizing help on the patio page.

Concrete Slabs, Foundations, & Garage Floors

Slabs and Garage Floors in Haverhill

Soil maps from NRCS at 30 points inside Haverhill show Myakka fine sand at two of every three points and every unit poorly or very poorly drained, with a water table around 31 cm (about a foot) in Myakka and 7 to 15 cm in the others. One third of the points land in Zone AE. So we look hard at the base: we compact it, form a 4 inch reinforced slab and cut control joints. The Town requires every contractor to register and asks for next-day inspection requests by 3 PM. A 10 by 12 foot shed slab is 120 square feet, or $840 to $1,440 at $7 to $12 per square foot, with a free written estimate. The slab page covers garage floors.

Questions We Get

How wide can my Haverhill driveway be?
Section 58-365 sets a minimum of 10 feet and a maximum of 24 feet, with an 18 foot minimum where needed for emergency access. New or expanded front-yard driveways must also sit 5 feet from front, corner-side, side and rear lot lines, except at the apron connection. As concrete contractors in Haverhill, we measure that setback from the lot line on your survey, not from the fence.
Can I stain or paint the sidewalk where my driveway crosses it?
No. The code says sidewalks shall not be altered, painted or stained, and swales cannot be altered unless an engineering permit is obtained. Keep the finish on your own side of the right-of-way line, and ask the Town about anything that touches the strip.
Why does the Town Engineer inspect my driveway twice?
The Engineer's first inspection happens at the placement of compacted sub-surface, before concrete is poured. The second is after the hard surface is installed. A Building Final then covers completed work and resodding. Your pour date depends on that first inspection.
Can I add a third driveway entrance to a corner lot?
No lot in the Town may have more than two driveway access points to any street. Each connection is flared as the Town or County engineer determines, and corner lots also meet the 5 foot setback from the side and corner-side lines.
Does a patio count toward the 40 percent limit?
A patio in the front yard does. Section 58-365(d) counts driveways, parking areas, walkways and patios together in the front yard. A back-yard patio is outside that calculation but still needs a Town permit, since the Town lists patios and slabs as permit work.
My lot is on Haverhill Road. Who permits the apron?
The Town maintains the right-of-way strip along Haverhill Road and Belvedere Road, and the driveway checklist adds that lots abutting major thoroughfares may need county and state permits too. Ask the Building Department who owns the roadway at your apron before pricing.
Which concrete contractors in Haverhill are allowed to work in the Town?
The Town requires every contractor to register before beginning any work. The Town also says that if you hire someone to do the work, they are responsible for obtaining the permit. Ask each bidder for their registration, then compare written quotes line by line.

Sources we used

What Our Clients Say

Find Us on the Map

Open the map for directions, hours and our Google reviews.

561-782-0848

Mon to Sun, 8am to 8pm

Open us on Google Maps

Page updated

Free written estimate in Haverhill

Call 561-782-0848 or fill out the quote form. We walk the lot, and a detailed written quote reaches you before any work begins.

Request an Estimate
CallFree Estimate